Another
aspect of the
DELTABEAM®
Frame is that
the fire-proofing
is built in – you
don’t need to
worry about that
on site.
This meant that the rails could be
installed already on the ground, and they
were instantly in place when the beam
was installed.
“Another aspect of the DELTABEAM®
Frame is that the fire-proofing is built in
– you don’t need to worry about that on
site,” Zwaan adds.
The construction team completed a
floor level every three weeks – choosing
the DELTABEAM® is an investment that
will pay dividends in terms of construction
speed and usable, rentable space. ●
PROJECT FACTS
• Project size: 12,000 m2 (14,000 sq yd)
• Floors: 9
• Developer: Leeds Investment
• Construction company: Bakels en Ouwerkerk Bouwgroep
• Architect: Centrum Architecten
• Precaster hollow-cores: VBI (Consolis)
• Structural designer: Van der Vorm Engineering B.V.
• Delivery year: 2020
• Completion year: 2021